Thames Tideway Tunnel reduces sewage discharge into the River Thames by 86%
The newly operational Thames Tideway Tunnel has cut raw sewage overflows into the river by 86% in its first year, while also capturing 84 tonnes of litter. By significantly reducing the number of days with health risks linked to water quality, the project marks a shift in the long-term recovery of the waterway.
Source: r/GoodNewsUK
Greater London
Read the full story