Engineers drill 100-metre tunnel beneath South London railway without stopping trains
Engineers have installed new electricity cables beneath a busy South London railway and tram line using a horizontal directional drill. By boring a 50-centimetre tunnel horizontally, the team upgraded critical power infrastructure without disrupting rail services for local commuters.
Source: r/GoodNewsUK
Greater London
Read the full story